• Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
  • Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
  • Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
  • Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
  • Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
  • Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester

Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester

After-sales Service: Suppor for Lifelong
Warranty: 1 Year
Type: Transformer Turns Ratio Tester
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester pictures & photos
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
US $800-1,500 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory

Basic Info.

Model NO.
HM5001z
Transformer Ratio
1--10000
Group
1--12 Point (12 Vector Groups)
Environment Temperature
-5--40
Humidity
<85%
Certificate
ISO
Standard
IEC
Transport Package
Wooden Box with Foam Inside
Specification
430*320*215mm
Trademark
GDHM
Origin
Hubei, China(Mainland)
HS Code
9030849000
Production Capacity
500sets/Month

Product Description

Electric Transformer Turn Ratio Meter TTR testing equipment 3 phase transformer turns ratio tester

I. Product overview

HM5001Z Transformer Turns Ratio Meter is specially designed for three-phase transformer in power system, it can perform full blind testing,and  it can adapt to the needs of various large, medium and small transformers transformation ratio testing (including Z-type transformers, rectifier transformers, electric furnace transformers, non-integral point-shifted phase changes, balanced changes, Scott and Inverse Scott Transformer)

The HM5001Z
Transformer Turns Ratio Meter has wide testing range, fast testing speed, favorable repeatability, flexible data processing, convenient connection, complete protection, easy learning and convenient operation.
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio TesterElectric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio TesterElectric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio TesterElectric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester


II. Technical index
1. TTR measurement range: 0.8~10000.
2. High measurement speed: three-phase test can be completed within 40 seconds.
3. Measurement accuracy:
Voltage measurement accuracy on HV side: 0.05%
Voltage measurement accuracy on LV side: 0.1%
Phase angle measurement accuracy: 0.1°
TTR measurement accuracy: 0.1%(0.8-3000)
                          0.2%(3000-10000)
4. Volume: 320mm*240mm*130mm.
5. Weight: 8Kg.
 Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
 
III. Function features 
1. Input single power, internal digital combination standard sine wave test source output
2. Phase angle measurement function: measure the phase angle between high voltage side and low voltage side. Measure the turn ratio and angle of "Non integral point" transformer.
3. It can conduct single-phase measurement and three-phase winding automatic test. Three phase turn ratio value, phase angle value, error, tapping position, tapping value can be measured for once.It also can identify connecting group number automatically.
4.Testing results can be displayed in the form of digit and hexagon vector diagram, which makes transformer connecting group can be made out obviously.
5. With blind test function: There is no need to choose connecting method and group. When measuring Y/△,△/Y transformer, no external short-circuit is needed,  connecting method can be shifted automatically according to the chosen testing contents.
6. With tapping test function: TTR and TTR error in the position of each tapping switch can be gauged quickly. Just input rated TTR once, instead of inputing over and over again, TTR error in tapping position can be calculated.
7. With functions of turns ratio measurement and voltage TTR measurement.
8. With 5.6 inch LCD, the effect of data & figure display is visualized and fine.
9. With small size and light weight, it is easy to carry.
10. With built-in high capacity chargeable lithium battery. Test can be conducted without any power supply on site, and once the battery is charged fully, it can make measurement for more than 500 times continuously.

IV. Related Products 
 
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester

Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester



Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester

 

Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester pictures & photos
Electric Transformer Turn Ratio Meter TTR Testing Equipment 3 Phase Transformer Turns Ratio Tester
US $800-1,500 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
Registered Capital
30000000 RMB
Plant Area
10000 square meters