Power Source: AC220V
Output Voltage: 0~1200kv
Pd Under Rated Volt(PC)(250-600): <3PC
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Partial Discharge Test Equipment for High Voltage Switchgear pictures & photos
Partial Discharge Test Equipment for High Voltage Switchgear
US $6,100-159,200 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory

Basic Info.

Model NO.
HM-GTU
Temp Rising (60mins at Rated Current)
<50K(Power Frequency)
Output Current
0~3A
Product Name
Partial Discharge Test Equipment
Transport Package
Wooden Box with Foam Inside
Trademark
GDHM
Origin
Hubei, China(Mainland)
Production Capacity
100sets/ Year

Product Description

Partial Discharge Test Equipment for High Voltage Switchgear
 

General information

The system is especially designed for testing GIS in the factory and on-site test, and for testing all GIS switchgears and GIS components such as insulators, insulating tension pole, GIS PT etc. It also can test transformers, power cables.

As its good encapsulation, it can perform PD test in normal environment. When it tests partial discharge, the PD level is less than 3pc, and it can be added a HV bushing to perform the withstand voltage test at the same time.


Feature
1.The equipment is small and available with minimal space
2.Components are light in weight
3. Rugged structure capable of handling long distance transportation
4. Direct connection with the subject
5. All high voltage parts are encapsulated in airtight space to ensure high safety of operators
6.Wide range applications, adding installation bushings can do normal withstand voltage testing.
7.Built in high voltage measurement and PD coupling capacitor
8.Built in high voltage isolating switch, which can separate interface of multiple test products, to ensure safety of high voltage test.
 

Basic configuration

1.GTU High Voltage test transformer

2.High voltage Coupling capacitor

3.High voltage measuring capacitor

4.Current limiting reactor

5.Voltage regulator

6. Isolated transformer

7. Compensation reactor

8. Console


Optional Configuration

1.Partial Discharge detector 

2.SF6 HV bushing and disconnecting switch


3.Annular tubes (included grading ring)

4. Various connection or adaptation flanges according to different test objects



Function of the testing system

1.The encapsulated test transformer is a conventional transformer and step-up the voltage coming from the voltage regulator. The compensating reactor connect with the HV transformer primary winding to compensate the capacitive current. (The HV transformer LV side has an independent compensating winding.)

2.For the on-site testing system, the voltage regulator, compensating reactor, Isolating transformer and control system are integrated into a cabinet. It gives a most compact equipment with a minimum number of components to be transported and connected for testing.

3.Using HV disconnecting switch to disconnect all types of test object connector to achieve widely use.

4.Three-phase change-over switch to test three phase in box system.

5.Universal adjustable platform to make HV transformer flange test object more 
conventional.
Partial Discharge Test Equipment for High Voltage Switchgear


Specifications
1. Voltage grade : 100kV, 200kV, 250kV, 300kV, 500kV, 750kV, 1000kV ;
2. Capacity : 50-2000kVA ;
3. High voltage generated mode: high voltage transformer voltage boost and series resonance(power frequency,frequency conversion);
4. All methods of boost voltage are one level voltage boost ,no need to cascade boost voltage;
5. Input voltage: 0.35-10kV;
6.Partial discharge capacity: Rated voltage 3pc (normal environment) ;
7.Impedance voltage: 5%;
8.Temperature rise: no more than 65k (50Hz) when rated current operates 60mins.
9.Altitude: Not limited for the HV parts
10.Relative humidity: Not limited for the HV parts 
11.Ambient temperature: -10ºC - 40ºC

12.Grounding system: ≤2Ω
13. Supply voltage: The waveform is sine wave
14. Wave distortion: <3%



Partial Discharge Test Equipment for High Voltage Switchgear
Partial Discharge Test Equipment for High Voltage Switchgear
Partial Discharge Test Equipment for High Voltage Switchgear







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Partial Discharge Test Equipment for High Voltage Switchgear pictures & photos
Partial Discharge Test Equipment for High Voltage Switchgear
US $6,100-159,200 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
Registered Capital
30000000 RMB
Plant Area
10000 square meters